Bandar Abbas
Refinery
Client : N.I.O.C
Completed 1990
|
Geotechnical and
geological site investigation, in-situ, and laboratory testing for
foundation design and sub-surface layers exploration of Bandar Abbas
refinery in South of Iran.
|
Arak Refinery
Client : TPL/JGC
joint venture
Completed : 1989
|
Geotechnical and
geological study, in-situ, and laboratory testing for foundation
design of Arak refinery in center of Iran. |
Mashhad Silo Retrofitting
Client : Selkhozprom
Expert
(Russian company)
Completed 1988
|
Geotechnical study,
site investigation, in-situ and soil cutting for rotating Mashhad
Silo with large differential settlement. |
Taheri Port Gas
Pipeline
Client : N.I.O.C
Completed 1988
|
Geotechnical and
earthquake study, site investigation, in-situ, and laboratory
testing for Taheri port gaspipeline in South of Iran.
|
Aghar Dallan
Pipeline
Client : N.I.O.C
Completed 1988
|
Geotechnical,
geological and hydraulic studies, site investigation, in-situ, and
laboratory testing for erosion control, slop stability
and foundation design of Aghar Dallan pipeline in South of Iran from
Dallan to Vali-e-Asr gas refinery.
|
Kavar Dam
Client : fars Water
Authority
Completed 1986
|
Geotechnical and
Geo-electrical studies, site investigation, in-situ and laboratory
testing for Kavar Dam construction in center of Iran. |
Moharram Pipeline &
Oil tank Storage
Client : N.I.O.C
Completed 1986
|
Geotechnical and
geological study site investigation, in-situ, and laboratory testing
for foundation design and slope stability analysis of Moharram
Pipeline and Oil Storage Tank in South-West of Iran.
|
Mobarakeh Steel
Industry Water Intake Complex
Client : National
Steel Industry
Completed 1984
|
Geotechnical/Geological study site investigation in-situ and
laboratory testing for foundation design of Mobarakeh Steel Industry
complex in Isfahan, center of Iran. |
Oil exportation
Facilities Harbor
Client : N.I.O.C
Completed 1984
|
Geotechnical and geological site investigation, in-situ, and
laboratory testing for foundation design and ground
preparation of oil exportation Harbor in South of Iran. |
Minab Oil Storage
Tank
Client : N.I.O.C
Completed 1984
|
Geotechnical and
geological site investigation, in-situ, and laboratory testing and
retaining wall design and slope stability analysis for Minab Oil
Storage Tank in South of Iran. |
1.33 Million Barrels
Oil Storage Tank
Client : N.I.O.C
Completed 1984
|
Geotechnical and
geological site investigation, in-situ, and laboratory testing,
seismic study for foundation in Isfahan, center of Iran.
|
Tabriz Refinery Oil
Storage Tank
Client : N.I.O.C
Completed : 1982
|
Settlement
measurement site investigation, in-situ and laboratory testing for
remedial work of oil storage tank in Tabriz, North-West of Iran.
|
Tehran-Tabriz
Pipeline
Client : IMEG IRAN
Completed : 1980
|
Geotechnical study,
site investigation, in-situ and laboratory testing for foundation
design and permafrost analysis of diameter pipeline between Tehran
and Tabriz and two pumping station.
|
IGAT-1 Pump Station
Client : N.I.G.C
Completed : 1980
|
Geotechnical study,
site investigation, in-situ and laboratory testing for foundation
design and engineering solution of existing cracks in embankment for
Asar pump station in South-West of Iran.
|
Lavan Flash Tank
Client : CBI Eastern
Ansalt
Completed 1979
|
Settlement
measurement site investigation, in-situ and laboratory testing for
remedial work of oil storage tank in Tabriz, North-West of Iran.
|
|