1 , 2  

November 2011 Soroosh FSU Anchoring System

Client: Sadaf Company

 

The field work consists of near 200m Geotechnical drilling, sampling and in-situ testing such as SPT test. Allowable bearing capacity and settlement of different types of pile foundations in addition with soil characteristics must be determined for engineering purposes.

 

November 2011 THE PROVISION OF SEABED GEOTECHNICAL SURVEYS AND ROV SERVICES FOR DRILLING OF FOUR EXPLORATORY WELLS IN PERSIAN GULF

Client: National Iranian Drilling Company

 The field work consists of near 360m Geotechnical drilling, sampling and in-situ testing such as SPT and CPTu tests. Also 4 1*1 km area is consider for geophysical survey. Allowable bearing capacity and settlement of spudcans in addition with soil characteristics must be determined for engineering purposes.

 

 Jofreh Port

Client: Iran Fishers Organization

Completed 2010

 

Offshore & Onshore Geotechnical Survey

Jask Oil Terminal

Client: Iranian Oil Terminals Company (IOTC)

Completed 2010

 

Offshore & Onshore Geotechnical Survey

Qeshm Bunkering Berth

Client: Qeshm Star Bunkering and Shipping Services

Completed 2010

 

Offshore Geotechnical Survey

Bousher Port Geotechnical Investigation

Client: Bousher Port Shipping Oraganization (P.S.O)

Completed 2008

 

Geotechnical Investigation Testing for Dredging in Bousher Port.

Qeshm -Hengam Pipeline Geotechnical Investigation

Client: Jonoub Tasisat

 Completed 2008

 

Offshore Geotechnical Survey/ Onshore Geotechnical Survey/ Investigation In-situ tests of SPT/ Coring /Shelby.

Siri-Assalouyeh Piplin Geotechnical Investigation

Client: Asia Akam Industry

Completed 2008

 

Geotechnical Investigation for Siri-Assaloyeh Pipeline with using Gravity and In-situ Pipeline and     Shear vare Tests.

Bandarabbs Harbors Geotechnical Investigation

Client: Persian Gulf Mining & Metal Industry Special Zone

Completed 2008

 

Geotechnical Investigation and In-situ tests mineral Embarkation harbour and another harbour Embarkation of Gas Production.

Reshadat Marine Pipelines

Client: IOEC: IRANIAN OFF-SHORE ENGINEERING AND CONSTRUCTION COMPANY

Completed 2008

 

Offshore Geotechnical Survey.

Persian LNG

Client: Total

Completed 2007

 

Geotechnical Investigation and In-situ tests and performing CPTu in Persian Gulf in South Pars area.

Pars LNG

Client: Shell

Completed 2006

 

Geotechnical Investigation and In-situ tests and performing CPTu in Persian Gulf in South Pars area.

Chabahar Marine Project

Client : Port & Shipping Organization

Completed 2005

 

Geotechnical Investigation and In-situ tests in Oman Sea.

Dez Dam

Client : Khozestan Water & Energy Organizetion

Completed 2005

 

Geotechnical Investigation to achieve the soil characteristics and thickness of sediments behind the Dez Dam.

Iran – India Gas Pipeline

Client : N.I.O.C/Gardline

 

Offshore geotechnical/Geophysical survey for Iran-India gas pipeline in Oman sea.

Iran Khazar Jack up

Client : N.I.O.C.

Completed 2004

 

Offshore geotechnical investigation and soil sampling in Caspian sea for Iran Khazar Jack up (depth

of  water about 70 M).

 

 

Deep sea coring

Client : KEPCO, N.I.O.C

Completed 2003

 

Offshore geotechnical investigation and soil sampling in Caspian Sea, using advanced Vibro-Corer for Khazar semi-submersible mooring system, coring down to 15 meters in seabed with up to 1000 meters water depth.

Assaluyeh Water Intake

Client : AGIP

Completed 2003

 

Offshore geotechnical investigation in Persian Gulf for Water Intake facilities in Assaluyeh, South of Iran  (depth of water 35 M).

South Pars

Client : Total South Pars

Completed 2002

 

Geotechnical Investigation and In-situ tests for Perlit harbur in Persian Gulf in South Pars area.