November 2011
Sinaye Azadi Building
Client:Tose
Sina Company |
The
field work consists of near 100m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
November 2011
Shahrekord Cement Factory
Client:Shahrekord
Cement Factory |
The
field work consists of near 315m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation. |
|
November 2011 Gheshm Water Refinery
Client:
Mapna 3 Company |
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
November 2011 Shahriyar Multistory
Parking
Client:
Shayegan Company |
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, CPTu, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
November 2011
Shiraz Highway Conjunctions
Client:
Shiraz Municipality
|
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, CPTu, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation. |
|
November 2011
Shiraz Highway
Conjunctions
Client:
Shiraz Municipality
|
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, CPTu, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
September
2011 Shahrekord Twin Tower
Client:
Shiraz Municipality
|
The
field work consists of near 150m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation. |
|
August 2011
Sirjan Electrical Modules
Client:
Ariyahadid Company
|
The
field work consists of near 300m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
July 2011
Tehran Cement Factory
Client:
Andishehsazan Company
|
The
field work consists of near 250m Geotechnical drilling, sampling and in-situ
testing such as SPT, plate load, electrical resistivity and downhole seismic
tests. Allowable bearing capacity and settlement of different types of
foundation in addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers will be evaluated as
part of Geotechnical Investigation.
|
|
June 2011
Multistory Parking
Client:
Tehran Municipality
|
The
field work consists of near 200m Geotechnical drilling, sampling and in-situ
testing such as SPT and downhole seismic tests. Allowable bearing capacity and
settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes. The dynamic
properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
May 2011 Ahvaz
Salt Clearance Project
Client:
Petrotaksan Company
|
The
field work consists of near 100m Geotechnical drilling, sampling and in-situ
testing such as SPT and plate load tests. Allowable bearing capacity and
settlement of different types of foundation in addition with soil
characteristics must be determined for engineering
|
|
Latman Kan Residential Building
Client:
Mellat Bank Construction Company |
The
field work consists of near 1000m Geotechnical drilling, sampling and in-situ
testing such as SPT tests. Allowable bearing capacity and settlement of
different types of foundation in addition with soil characteristics must be
determined for engineering purposes.
|
|
Noboniyad Residential BuildingClient:
Ebtekar Sazeh Company
Completed: 2011 |
The
field work consists of near 150m Geotechnical drilling, sampling and various
in-situ testing such as SPT and downhole seismic tests. Allowable bearing
capacity and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes.The dynamic
properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
Darous Building
Client:
Atava Construction Company
Completed: 2011
|
The
field work consists of near 100m Geotechnical drilling, sampling and various
in-situ testing such as SPT, downhole and piezometer tests. Allowable bearing
capacity and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes.The dynamic
properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
Samen Chadormaloo Steel Factory
Client:
Arkan Tadbir Sazeh Company
Completed: 2011
|
The
field work consists of near 200m Geotechnical drilling, sampling and various
In-situ testing such as SPT and permeability tests.Allowable bearing capacity
and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes.
|
|
Farashband Gas
Refinery Extention
Client:
Chegalesh Consulting Engineers
Completed: 2011 |
The
field work consists of near 300m Geotechnical drilling, sampling and various
In-situ testing such as down hole, SPT, pieozometer, Electrical Resistivity, and
Vane shear tests. Allowable bearing capacity and settlement of different types
of foundation in addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers will be evaluated as
part of Geotechnical Investigation.
|
|
South of
Tehran Subway (Parand)
Client:
Rahsaz Tarh Company
Completed: 2010 |
The
field work consists of near 1900m Geotechnical drilling, sampling and various
In-situ testing such as SPT, down hole, pieozometer tests. Allowable bearing
capacity and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes. The dynamic
properties of soil layers will be evaluated in a separate seismic report. |
|
Mahboub Liyan
ShipyardClient:
Mahboub Liyan Shipyard Company
|
The
field work consists of near 300m Geotechnical drilling, sampling and various
In-situ testing such as SPT and piezometer tests. Allowable bearing capacity and
settlement of different types of shallow and deep foundation in addition with
soil characteristics must be determined for engineering purposes. |
|
Waste water Transmission from Tehran to Qom
Client:
Qom
Regional Water Company
|
The
field work consists of near 200m Geotechnical drilling, sampling and various
In-situ testing such as SPT and permeability tests. Allowable bearing capacity
and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes.
|
|
Mashhad Subway
Client:
Mashhad Urban & Suburban Railway Operation Company
Completed: 2010 |
The
field work consists of near 600m Geotechnical drilling, sampling and various
In-situ testing such as plate load, down hole seismic test, pressure meter and
electrical resistivity tests. Allowable bearing capacity and settlement of
different types of foundation in addition with soil characteristics must be
determined for engineering purposes. The dynamic properties of soil layers will
be evaluated as part of Geotechnical Investigation.
|
|
Imam Khomeyni International Airport Hotel
Client:
Tarh va Afarinesh Company
Completed: 2010
|
The
field work consists of near 80m onshore Geotechnical drilling, sampling, in-situ
testing such as SPT test. The test performed by drilling machines and adequate
instruments. Allowable static and dynamic bearing capacity and settlement of
pile foundation in addition of soil characteristics must be determined for
engineering purposes.
|
|
Mellat Auto Bank :
Client:
Mellat Bank
Completed: 2010
|
The
field work consists of 250m onshore Geotechnical drilling, sampling, in-situ
testing such as SPT and Downhole Seismic tests. The tests will be performed by
drilling machines and adequate instruments. Allowable static and dynamic bearing
capacity and settlement of different types of shallow foundation in addition of
soil characteristics and bearing capacity of rock layers must be determined for
engineering purposes.
|
|
Qom General Water Refinery (Second Module):
Client:
Qom Water and Wastewater Company
Completed: 2010
|
The field work consists of 366m onshore
Geotechnical drilling, sampling, in-situ testing such as SPT, PMT, Plate Load
and Downhole tests. The tests will be performed by drilling machines and
adequate instruments. Allowable static and dynamic bearing capacity and
settlement of different types of shallow foundation in addition to soil
characteristics and bearing capacity of rock layers must be determined for
engineering purposes.
|
|
Vanak Commercial Complex:
Client:
Royal Renaissance Company
Completed: 2010
|
The
commercial complex consists of a 28-stories building with 8 stories located
underground. The field work consists of one 60m Geotechnical borehole drilled
under the high rise part. Allowable static bearing capacity and settlement of
different types of shallow and deep foundation in addition to exploration
program prepared by Mandro (2004) for engineering purposes. In order to check
the bearing capacity of foundation for lowerrity underground water and
stabilizing the walls of excavation, further investigation will be prepared.
|
|
Jask Oil Terminal:
Client:
Iranian Oil Terminals Company (IOTC)
|
The
field work consists of 630m offshore and 1210m onshore Geotechnical drilling,
sampling, in-situ testing such as SPT, PMT, Electrical Resistivity, Plate Load,
CBR and Downhole tests, Geological, Hydrological, Hydroclimatological and
Seismic Hazard risk will also be studied. Offshore survey will be perform from
ARTEMIS and ARAS drilling vessel and Onshore survey will be performed by 4
mobile and skid base drilling machines. Allowable static and dynamic bearing
capacity and settlement of different types of shallow and deep foundation in
addition to soil characteristics and liquefaction must be determined for
engineering purposes.
|
|
Yadavaran Oil Field:
Client:
Sinopec (China)
Completed: 2010
|
Mandro
is performing Geotechnical and seismic studies for Yadavaran Oil Field which is
one of the world's largest oil field located South-West Iran. The field work
which was started recently is consisted of 1800m Geotechnical drilling, sampling
and various in-situ testing such as plate load, down hole, pressure meter, CPTu
and electrical resistivity tests. Allowable bearing capacity and settlement of
different types of foundation in addition with soil characteristics must be
determined for engineering purposes. The dynamic properties of soil layers will
be evaluated as part of Geotechnical Investigation.
|
|
Phase 12 South Pars Refinery Fire Tanks
Client:
NASR Consortium
Completed: 2010 |
The
field work consists of near 80m Geotechnical drilling, sampling and various
In-situ testing such as down hole, pressure meter and SPT tests. Allowable
bearing capacity and settlement of different types of foundation in addition
with soil characteristics must be determined for engineering purposes. The
dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
IRANSHAHR Combined Cycle Power Plant
Client:
MAPNA Power Plant Construction & Development Company
Completed: 2010
|
The
field work consists of near 460m Geotechnical drilling, sampling and various
in-situ testing such as plate load, down hole, pressure meter and electrical
resistivity tests. Allowable bearing capacity and settlement of different types
of foundation in addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers will be evaluated as
part of Geotechnical Investigation.
|
|
Hormozgan II (Gueno) Combined Cycle Power
Plant
Client:
MAPNA Power Plant Construction & Development Company
Completed: 2009
|
The field work consists of near 620m Geotechnical drilling,
sampling and various in-situ testing such as plate load and
electrical resistivity tests and laboratory testing.
Allowable bearing capacity and settlement of different types
of foundation in addition with soil characteristics must be
determined for engineering purposes. The dynamic properties
of soil layers will be evaluated as part of Geotechnical
Investigation. |
|
Ardebil Extension Gas Turbine Power Plant
Client:
MAPNA Power Plant Construction & Development Company
Completed: 2009 |
The field work consisted of Geotechnical drilling Sampling
and various In-situ testing such as
pressuremeter,
plate load and electrical resistively test. Allowable
bearing capacity and settlement of different types of
foundation in addition with soil characteristics have been
determined for engineering purposes. The dynamic properties
of soil layers have been also evaluated with down hole test
as a part of Geotechnical Investigation.
|
|
Petronas
Turkmenistan
( in KIYANLI) Gas Separation Plant Project:
Client:
Petronas Company
Completed: 2009
|
The field work consists of near 90m Geotechnical drilling,
Sampling and various in-situ testing such as down hole,
Electrical resistivity, Mackintosh tests and buried
structure detection. Topography and benchmark survey in
addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers
will be evaluated as part of Geotechnical Investigation. |
|
Pars LNG
Client:
TOTAL
Completed: 2007 |
Field work for the
onshore Geotechnical and Geophysical survey at the site of Pars LNG
(Total) in Tombak is completed in 2007.The field work entails
extensive coring, CPTu and diagraphy to abtain accurate field data
for the design of super creogenic tanks and other major
installation.
|
|
Persian LNG
Client: SHELL
Completed: 2007 |
Persian LNG
(Shell GSI) midstream onshore geotechnical investigation
successfully carried out at Tombak site in South Pars gas
field Area (near Assaloyeh) on December 2006 . In addition
to drilling of exploratory boreholes and in-situ tests more
than 30Km geophysical seismic refraction tests were
performed .Also for seismic activity of the site
Luminescence age dating test was done with cooperation of
Oxford University Archeological laboratory.
|
|
Shahid Beheshti Port Development
Client:
Port 7shipping
Organization
Complete: 2007
|
Geotechnical
investigation and seismic hazard analysis for onshore and
nearshore , Menard Pressure Meter Test to measure to lateral
modulus of elasticity was used extensively. |
|
CPF Cluster Sarvestan and Saadat Abad
Client:
Oil Design & Construction
Company (ODDCC) and Pertrotaksan J.V
Complete 2007
|
Technique of DPR to detect cavities up to the depth to
30 meters under CPF Cluster located in the oil field
Sarvestan Saadat Abad -Zagross mountain. Continual
geotechnical and Geophysical investigation was undertaken to
recommend the type of foundations
and
the properties of soil layers.
|
|
Lavan Oil Refinery
Client:
NAMVARAN
Complete: 2007
|
Geotechnical and
geological site investigation , in-situ , and laboratory
testing for foundation design and sub-surface layer
exploration of Lavan refinery in South of Iran. |
|
Azadegan Field
Development
Client : INPEX
Completed: 2006
|
Mandro is conducting
the preliminary geotechnical and seismic studies for one of
the world’s largest oil field in South-West Iran for INPEX.
The field work. The study which was done with the
supervision of Foster Wheeler of U.K. was consisted of :
1- Detection
of buried ordinance up to depth 30 meters.
2-
Geotechnical investigation to determine the type of
foundations and soil characteristics.
3-
Geophysical studies to evaluate seismic properties of soil
layers.
|
|
Dez Dam Sediments
Client :
Khuzestan Water Authority
Completed: 2005 |
Geotechnical study
and site investigation for Dez Dam for the study of
sediments entailing drilling 100-meter boreholes in water
depth of 100 meters. |
|
Assaluyeh Offsite
Facilities
Clients :
N.I.P.C.
Completed 2005 |
Geotechnical
investigation, civil works, and structural design and supervision of
offsite facilities in Assaluyeh petrochemical complex, entailing 8
petrochemical plants and other services.
|
|
Assaluyeh Diversion
Dams
Clients : N.I.P.C.
Completed:2004
|
Geotechnical study,
site investigation, in-situ and laboratory testing for ten
diversion dam sites of Assaluyeh petrochemical complex South
of Iran. |
|
Zagross Field
Client :
OEID/NIOC
Completed 2004
|
Mandro is conducting
the geotechnical, environmental, hydrological and seismic studies
for an oil fields in Central Iran stretching over 900 Kilometers.
The field work for these investigations was completed. Final report to be issued late November.
|
|
Iran-India Gas
Pipeline
Client :
N.I.O.C./Gardline
Completed: 2004
|
Geotechnical\geophysical survey for Iran-India gas pipeline in Oman
sea.
|
|
Iran
Khazar Jack up
Client : N.I.O.C.
Completed 2004
|
Offshore
geotechnical investigation and soil sampling in Caspian sea for Iran
Khazar Jack up (dept of water is about 70-meter.
|
|
Site Engineering
Services
Client:
Total South
Pars
Completed: 2004
|
Site inspection
engineers for quality control/quality assurance team in relation to
the South Pars Development (refinery construction)
|
|
Providing
Personnel for Training Department
Client : Total South
Pars
Completed: 2003
|
High
qualified personnel for training schedule of Total Co. in relation
to South Pars Development project.
|