August  2016, Geotechnical  investigation for Behabad Pelletizing Plant

Type of Project: Onshore Geotechnical Investigation

Client: Parsland Mines Industries Developement Company (Pamidco)

 

Location: Behabad city

Field work: This Project consists of 12 exploratory boreholes to the maximum depth of 3 meters below the natural ground level with 10 to 30 meters depth. The boreholes were drilled by wash boring method and throughout the operation core and disturbed samples were obtained. SPT, Down hole and also Electrical resistivity tests have done.

Laboratory Services: determination of physical and mechanical properties of the soil layers, classification and shear strength tests, Water content, unit weight, Atterberg limits, particle size distribution, particle density, Strength testing, Un-confined compression test (UCT) and unconsolidated undrained (UU) triaxial, Chlorine Content (Soil and Water), Sulphates Content (Soil and Water), , PH (Smoil and Water) and etc.

Outcome: Final report includes Determination of the type and thickness of soil layers, physical and mechanical properties, Study the liquefaction, swell or collapse potential of soil layers. Determination of dynamic properties, allowable soil pressure and estimation of settlement of shallow foundations, modulus of sub grade reaction, lateral soil pressure and soil-concrete friction coefficient, allowable slope of excavations, type of cement to be used in concreting foundations, soil permeability, earthquake coefficients according to 2800 code and technical suggestions and recommendations with respect to construction operations.

 

August  2016, Geotechnical Investigation in Fateh Kimia Petrochemical Complex

Type of Project: Onshore Geotechnical Investigation

Client: Fateh Kimia Petrochemical Company

 

Location: Boushehr

Field work: This Project consists of drilling 31 exploratory boreholes with 5 to 45 meters depth in continuous coring procedure and core sampling, SPT, Plate load, Down Hole tests.

Laboratory Services: determination of physical and mechanical properties of the soil layers, classification and shear strength tests, Water content, unit weight, Atterberg limits, particle size distribution, particle density, Strength testing, Un-confined compression test (UCT) and unconsolidated undrained (UU) triaxial, CBR, Chlorine Content (Soil and Water), Sulphates Content (Soil and Water), Soil Carbonate Content, Soil Organic Content, Total dissolved solids (TDS), PH (Smoil and Water)  .

Outcome: Final report includes Geology zone situation and layout, Physical , chemical and dynamic soil properties, sub water, active and  passive coefficients, permeability, bearing capacity, pile and surface foundation settlement, etc

 

July 2016 Geotechnical Investigation at Kermanshah Bioethanol Production Plant Project

Type of Project: Onshore Geotechnical Investigation

Client: Moshiran

Location: South Western corner of Iran in Kermanshah city, Bistoon industrial town

Field work: This Project entailed drilling 16 exploratory boreholes with maximum 30 meters depth including SPT, excavating 15 trial pits for plate load test, in-situ geophysical test with Down-hole method in one borehole and in-situ CBR )

Laboratory Services:  Determination of Atterberg limits, Grain size (sieve analysis), Specific Gravity, Water Content, Soil Density, Soil Classification, Triaxial Compression (TUU), Triaxial Compression (TCU), Triaxial Compression (TCD), Direct Shear Test (DST), Consolidation (CON), Collapse potential, Uniaxial compression (UCT), Permeability (PER), Compaction(modified) (COM), CBR, Chlorine Content (Soil and Water), Sulphates Content (Soil and Water), Soil Carbonate Content, Soil Organic Content, Total dissolved solids (TDS), PH (Smoil and Water).

Outcomes: Final report includes description of field work and in-situ testing, boreholes descriptions, physical, mechanical and properties of soil, results of in-situ and laboratory experiments, appropriate, etc.

 

May 2015 Soil improvement under the foundation of Emam Reza residential-bussines complex

Type of Project: Onshore Geotechnical Investigation

Client: : Bana Consulting Engineer

 

Location: Mashhad

Out come: Final report includes the micro pile designing on base of previous site investigations and in-situ tests

October 2014 Geotechnical Investigation, Seismic Hazard Analysis And Flood Control Study for Combine Cycle Power Plants Project at Zarand Kerman

Type of Project: Onshore Geotechnical Investigation

Client: MAPNA Group(MD3)

 

Location: Zarand- Kerman    

Field Work: Total of 130m Geotechnical drilling, In-situ Testing and sampling such as SPT, Down-hole test, test pits, Plate Load test, Electrical Resistivity test and Lefranc

Laboratory Services: Determination of soil classification, allowable and ultimate Bearing Capacity of sub-soil, type of foundation, ground water level and Dynamic properties of soil.

Seismic Hazard Analysis: Determination of Seismicity Parameters, Risks of Landslides, maximum Ground Acceleration, etc.

 Flood control studies: Calculation of Flood Volume, specified Flood Zoning, Design of Flood Control System, etc.

Outcomes: Final report includes description of field work and in-situ testing, boreholes descriptions, physical, mechanical and dynamic properties of soil, results of in-situ and laboratory experiments, appropriate methods of ground improvement, determination of soil bearing capacity, etc.

 

September 2014 Geotechnical Investigation and Seismic Hazard Analysis for Kish Gas Power Plant

Type of Project: Onshore Geotechnical Investigation

    Client: MAPNA Special Projects Construction & Development Co.

 

Location: Aftab Port- Hormozgan     

Field Work: Total of 110m Geotechnical drilling, In-situ Testing and sampling such as SPT, Down-hole test, test pits, plate load test, electrical resistivity test and Lefranc.

Laboratory Services: Determination of soil characteristics, resistivity and consolidation test, Chemical test, etc.

Seismic Hazard Analysis: Determination of Seismicity Parameters, Risks of Landslides, maximum Ground Acceleration, etc.

Outcomes: Final report includes description of field work and in-situ testing, boreholes descriptions and sub-layers characteristics, physical, mechanical and dynamic properties of soil,

 

August 2014 naft-sangin Gheshm Refinery

Type of Project: Offshore and Onshore Geotechnical Investigation

Client: Behin Palayesh

 

 

Project of Naft-sangin Gheshm Refinery (Gheshm Crude Oil  Refinery) is located at Northern territory of Qeshm Island with total area of almost 30 hectare. In this project, several facilities such as tank farm, structure of process plant, Non-industrial buildings and port such as deck and berth for Ingredients intake and petroleum products have been considered. Geotechnical investigation consists of several drilling boreholes totaling 160m offshore and 460m near-shore. Testing of samples to define the subsurface soil conditions and in-situ testing such as SPT, Piezometer, CBR test, plate load test, electrical test, and Down-hole seismic test were performed. Borehole layout includes status and position of the layers at different depth, Soil classification and depth of subsoil or bed rock which are sufficient as the bearing subsoil of major foundation structure are verified. In addition allowable and ultimate bearing capacity of subsoil at the bottom of the shallow foundation, Parameters required for design of deep foundations and Dynamic parameters of soil are determined for engineering purposes.

 

May 2014 Siraf Sport and Cultural Complex Geotechnical Investigation Project

Type of Project: Onshore Geotechnical Investigation

Client: IRAN ARCH

 

 

Location: Taheri port- Siraf/Bushehr      X=633841, Y=3056567

Field Work: Total of meters of 215 Geotechnical drilling and 2 test pits, sampling and in-situ testing such as SPT and Down-hole test

Outcomes: Soil Characteristics and Allowable bearing capacity

 

March 2014 Nashtaroud Geotechnical Investigation Project

Type of Project: Onshore Geotechnical Investigation

Client: Cashalot Engineering and Construction Company

 

Location: Nashtaroud-Mazadandaran      X=504148, Y=4066571

Field Work: Total of 130m Geotechnical drilling

In-situ Testing: sampling, Down-hole test and Piezometers to evaluate changes in groundwater level are verified

Laboratory Services: Determine soil characteristics, resistivity and consolidation test, Chemical test

Outcomes: Final report includes description of field work and in-situ testing, Geological maps,  boreholes and test pits description, results of in-situ and laboratory experiments, dynamic  properties of soil, determine Allowable bearing capacity, and etc.

 

November 2013 Qeshm Top Island

Type of Project: Onshore Geotechnical Investigation

Client:Qeshm Top Island Company

 

 

 

The field work consists of near 200m Geotechnical drilling, sampling and in-situ testing such as SPT, Pressuremeter. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

October 2013 Yazd ShahidGhandi

Type of Project: Onshore Geotechnical Investigation

Client:RahnemoonEghtesad Company

 

 

The field work consists of near 300m Geotechnical drilling, sampling and in-situ testing such as SPT, Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

  

September 2013 Kerman FooladGhadir

Type of Project: Onshore Geotechnical Investigation

Client: Sanat Pars Company

 

The field work consists of near 325m Geotechnical drilling, sampling and in-situ testing such as SPT, Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

August 2013 Padideh Kish

Type of Project: Onshore Geotechnical Investigation

Client: AsarBana Pars Company

 

The field work consists of near 450m Geotechnical drilling, sampling and in-situ testing such as SPT, pressure meter test and insitu density test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

 

July 2013 Pasargad Bank Central Office

Type of Project: Onshore Geotechnical Investigation

Client: Pasargad Bank

 

The field work consists of near 210m Geotechnical drilling, sampling and in-situ testing such as SPT, pressure meter test and Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

 

July 2013 Multi store Parking

Type of Project: Onshore Geotechnical Investigation

Client: Ganjineh Atieh Company

 

The field work consists of near 200m Geotechnical drilling, sampling and in-situ testing such as SPT, pressure meter test and Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

 

June 2013 Sangan Constantre Factory

Type of Project: Onshore Geotechnical Investigation

Client: Pamidco Company

 

The field work consists of near 750m Geotechnical drilling, sampling and in-situ testing such as SPT, plate load, electrical resistivity test and Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

 

May 2013 Morvarid Residential Building

Type of Project: Onshore Geotechnical Investigation

Client: Omran and Tose Company

 

The field work consists of near 50m Geotechnical drilling, sampling and in-situ testing such as SPT, plate load test and Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

 

March 2013 Multi Chamber Cement Factory

Type of Project: Onshore Geotechnical Investigation

Client: Tehran Cement Factory

 

 

The field work consists of near 100m Geotechnical drilling, sampling and in-situ testing such as SPT, plate load test and Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes.

February 2013 Sina Azadi Complex

Type of Project: Onshore Geotechnical Investigation

Client: Tose Sina Company

 

The field work consists of retaining wall designation and supervision which is over 30m height including Verification and proof tests and also quality control of construction is under progress.

January 2013 Rasht Water Storage

Type of Project: Onshore Geotechnical Investigation

Client: Arman Sazeh Gil Company

 

The field work consists of near 200m Geotechnical drilling, sampling and in-situ testing such as SPT, and Downhole seismic test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics were determined for engineering purposes. Also the designation of retaining structure with nailing method was done as part of Geotechnical Investigation.

 

January 2013 AbuMusa Soil Investigation Project

Type of Project: Onshore and Near-shore Geotechnical Investigation

Client: Mapna Special Projects Construction & Development Co. (MD3)

 

Geotechnical investigation consists of drilling boreholes near 350m offshore and near-shore, testing of samples to define the subsurface soil and rock conditions and in-situ testing such as SPT, plate load test and Downhole seismic test. Soil classification, the depth of subsoil or bed rock which are sufficient as the bearing subsoil of major foundation structure and allowable and ultimate bearing capacity of subsoil at the bottom of the shallow foundation were determined for engineering purposes.

 

August 2012 Daralou Copper Mine Complex

Type of Project: Onshore Geotechnical Investigation

Client: National Iranian Copper Industries Co.

 

The field work consists of near 7000m Geotechnical drilling with the maximum borehole depth around 400m, sampling and in-situ testing such as borehole permeability tests, pressure packer test (Lugeon), standard penetration test, mass infiltration test, Downhole test and seismic reflection test. Rock slope stability analysis, Seismic studies, Engineering Geology, Hydrology and Climatology will be determined for engineering purposed. Also the drilling method is based on wire-line systems with triple tube core barrel. 

 

 

June 2012 Twin Tower Shahrekord

Type of Project: Onshore Geotechnical Investigation

Client: Shahrekord Municipality

 

The field work consists of near 75m Geotechnical drilling, sampling and in-situ testing such as SPT and Pressuremeter tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

May 2012 Bandar Anzali Hotel

Type of Project: Onshore Geotechnical Investigation

Client: Naftagaz Mad Company

 

The field work consists of near 115m Geotechnical drilling, sampling and in-situ testing such as SPT, Electrical Resistivity, Plate Load and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

January 2012 Shemshad Commercial Complex

Type of Project: Onshore Geotechnical Investigation

Client: Ganjineh Atieh Company

 

The field work consists of near 140m Geotechnical drilling, sampling and in-situ testing such as SPT, Piezometer, Pressuremeter and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

December 2011 Qeshm Residental and Commercial Complex

Type of Project: Onshore Geotechnical Investigation

Client: NiliAbi Company

 

The field work consists of near 170m Geotechnical drilling, sampling and in-situ testing such as SPT, Piezometer and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

November 2011 Sinaye Azadi Building

Client:Tose Sina Company

 

The field work consists of near 100m Geotechnical drilling, sampling and in-situ testing such as SPT, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

November 2011 Shahrekord Cement Factory

Client:Shahrekord Cement Factory

 

The field work consists of near 315m Geotechnical drilling, sampling and in-situ testing such as SPT, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

November 2011 Gheshm Water Refinery

Client: Mapna 3 Company

 

The field work consists of near 225m Geotechnical drilling, sampling and in-situ testing such as SPT, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

November 2011 Shahriyar Multistory Parking

Client: Shayegan Company

 

The field work consists of near 225m Geotechnical drilling, sampling and in-situ testing such as SPT, CPTu, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

November 2011 Shiraz Highway Conjunctions

Client: Shiraz Municipality

 

The field work consists of near 225m Geotechnical drilling, sampling and in-situ testing such as SPT, CPTu, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

September 2011 Shahrekord Twin Tower

Client: Shiraz Municipality

 

The field work consists of near 150m Geotechnical drilling, sampling and in-situ testing such as SPT, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

August 2011 Sirjan Electrical Modules

Client: Ariyahadid Company

 

The field work consists of near 300m Geotechnical drilling, sampling and in-situ testing such as SPT, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

July 2011 Tehran Cement Factory

Client: Andishehsazan Company

 

The field work consists of near 250m Geotechnical drilling, sampling and in-situ testing such as SPT, plate load, electrical resistivity and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

June 2011 Multistory Parking

Client: Tehran Municipality

 

The field work consists of near 200m Geotechnical drilling, sampling and in-situ testing such as SPT and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

 

May 2011 Ahvaz Salt Clearance Project

Client: Petrotaksan Company

 

The field work consists of near 100m Geotechnical drilling, sampling and in-situ testing such as SPT and plate load tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering

 

 

Latman Kan Residential Building

Client: Mellat Bank Construction Company

 

The field work consists of near 1000m Geotechnical drilling, sampling and in-situ testing such as SPT tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes.

 

 

Noboniyad Residential BuildingClient: Ebtekar Sazeh Company

Completed: 2011

 

The field work consists of near 150m Geotechnical drilling, sampling and various in-situ testing such as SPT and downhole seismic tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes.The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

Darous Building

Client: Atava Construction Company

Completed: 2011

 

The field work consists of near 100m Geotechnical drilling, sampling and various in-situ testing such as SPT, downhole and piezometer tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes.The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

 

Samen Chadormaloo Steel Factory

Client: Arkan Tadbir Sazeh Company

Completed: 2011

 

The field work consists of near 200m Geotechnical drilling, sampling and various In-situ testing such as SPT and permeability tests.Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes.

 

 

Farashband Gas Refinery Extention

Client: Chegalesh Consulting Engineers

Completed: 2011

 

The field work consists of near 300m Geotechnical drilling, sampling and various In-situ testing such as down hole, SPT, pieozometer, Electrical Resistivity, and Vane shear tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

 

South of Tehran Subway (Parand)

Client: Rahsaz Tarh Company

Completed: 2010

 

The field work consists of near 1900m Geotechnical drilling, sampling and various In-situ testing such as SPT, down hole, pieozometer tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated in a separate seismic report.

 

Mahboub Liyan ShipyardClient: Mahboub Liyan Shipyard Company

The field work consists of near 300m Geotechnical drilling, sampling and various In-situ testing such as SPT and piezometer tests. Allowable bearing capacity and settlement of different types of shallow and deep foundation in addition with soil characteristics must be determined for engineering purposes.

 

 

Waste water Transmission from Tehran to Qom

Client: Qom Regional Water Company

 

The field work consists of near 200m Geotechnical drilling, sampling and various In-situ testing such as SPT and permeability tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes.

 

 

Mashhad Subway

Client: Mashhad Urban & Suburban Railway Operation Company

Completed: 2010

 

The field work consists of near 600m Geotechnical drilling, sampling and various In-situ testing such as plate load, down hole seismic test, pressure meter and electrical resistivity tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

Imam Khomeyni International Airport Hotel

Client: Tarh va Afarinesh Company

Completed: 2010

 

The field work consists of near 80m onshore Geotechnical drilling, sampling, in-situ testing such as SPT test. The test performed by drilling machines and adequate instruments. Allowable static and dynamic bearing capacity and settlement of pile foundation in addition of soil characteristics must be determined for engineering purposes.

 

Mellat Auto Bank :

Client: Mellat Bank

Completed: 2010

 

The field work consists of 250m onshore Geotechnical drilling, sampling, in-situ testing such as SPT and Downhole Seismic tests. The tests will be performed by drilling machines and adequate instruments. Allowable static and dynamic bearing capacity and settlement of different types of shallow foundation in addition of soil characteristics and bearing capacity of rock layers must be determined for engineering purposes.

 

Qom General Water Refinery (Second Module):

Client: Qom Water and Wastewater Company

Completed: 2010

 

The field work consists of 366m onshore Geotechnical drilling, sampling, in-situ testing such as SPT, PMT, Plate Load and Downhole tests. The tests will be performed by drilling machines and adequate instruments. Allowable static and dynamic bearing capacity and settlement of different types of shallow foundation in addition to soil characteristics and bearing capacity of rock layers must be determined for engineering purposes.

 

Vanak Commercial Complex:

Client: Royal Renaissance Company

Completed: 2010

 

The commercial complex consists of a 28-stories building with 8 stories located underground. The field work consists of one 60m Geotechnical borehole drilled under the high rise part. Allowable static bearing capacity and settlement of different types of shallow and deep foundation in addition to exploration program prepared by Mandro (2004) for engineering purposes. In order to check the bearing capacity of foundation for lowerrity underground water and stabilizing the walls of excavation, further investigation will be prepared.

 

Jask Oil Terminal:

Client: Iranian Oil Terminals Company (IOTC)

 

The field work consists of 630m offshore and 1210m onshore Geotechnical drilling, sampling, in-situ testing such as SPT, PMT, Electrical Resistivity, Plate Load, CBR and Downhole tests, Geological, Hydrological, Hydroclimatological and Seismic Hazard risk will also be studied. Offshore survey will  be perform from ARTEMIS and ARAS drilling vessel and Onshore survey will be performed by 4 mobile and skid base drilling machines. Allowable static and dynamic bearing capacity and settlement of different types of shallow and deep foundation in addition to soil characteristics and liquefaction must be determined for engineering purposes.

 

Yadavaran Oil Field:

Client: Sinopec (China)

Completed: 2010

 

Mandro is performing Geotechnical and seismic studies for Yadavaran Oil Field which is one of the world's largest oil field located South-West Iran. The field work which was started recently is consisted of 1800m Geotechnical drilling, sampling and various in-situ testing such as plate load, down hole, pressure meter, CPTu and electrical resistivity tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

Phase 12 South Pars Refinery Fire Tanks

Client: NASR Consortium

Completed: 2010

 

The field work consists of near 80m Geotechnical drilling, sampling and various In-situ testing such as down hole, pressure meter and SPT tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

IRANSHAHR Combined Cycle Power Plant

Client: MAPNA Power Plant Construction & Development Company

Completed: 2010

 

The field work consists of near 460m Geotechnical drilling, sampling and various in-situ testing such as plate load, down hole, pressure meter and electrical resistivity tests. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

Hormozgan II (Gueno) Combined Cycle Power Plant

Client: MAPNA Power Plant Construction & Development Company

Completed: 2009

 

The field work consists of near 620m Geotechnical drilling, sampling and various in-situ testing such as plate load and electrical resistivity tests and laboratory testing. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

Ardebil Extension Gas Turbine Power Plant

Client: MAPNA Power Plant Construction & Development Company

Completed: 2009

 

The field work consisted of Geotechnical drilling Sampling and various In-situ testing such as pressuremeter, plate load and electrical resistively test. Allowable bearing capacity and settlement of different types of foundation in addition with soil characteristics have been determined for engineering purposes. The dynamic properties of soil layers have been also evaluated with down hole test as a part of Geotechnical Investigation.

 

Petronas Turkmenistan

( in KIYANLI) Gas Separation Plant Project:

Client: Petronas Company 

 Completed: 2009

 

The field work consists of near 90m Geotechnical drilling, Sampling and various in-situ testing such as down hole, Electrical resistivity, Mackintosh tests and buried structure detection. Topography and benchmark survey in addition with soil characteristics must be determined for engineering purposes. The dynamic properties of soil layers will be evaluated as part of Geotechnical Investigation.

 

Pars LNG 

Client: TOTAL   

Completed: 2007

 

Field work for the onshore Geotechnical and Geophysical survey at the site of Pars LNG (Total) in Tombak is completed in 2007.The field work entails extensive coring, CPTu and diagraphy to abtain accurate field data for the design of super creogenic tanks and other major installation. 

 

Persian LNG         

Client: SHELL  

Completed: 2007

 

Persian LNG (Shell GSI) midstream onshore geotechnical investigation successfully carried out at Tombak site in South Pars gas field Area (near Assaloyeh) on December 2006 . In addition to drilling of exploratory boreholes and in-situ tests more than 30Km geophysical seismic refraction tests were performed .Also for seismic activity of the site Luminescence age dating test was done with cooperation of Oxford University Archeological laboratory.

 

Shahid Beheshti Port Development

Client: Port 7shipping Organization

Complete: 2007

 

Geotechnical  investigation and seismic hazard analysis for onshore and nearshore , Menard Pressure Meter Test to measure to lateral modulus of elasticity was used extensively.

 

CPF Cluster Sarvestan and Saadat Abad

Client: Oil Design & Construction  Company (ODDCC) and Pertrotaksan  J.V

Complete 2007

 

Technique of DPR  to detect cavities up to the depth to 30 meters under CPF Cluster located in the oil field Sarvestan Saadat Abad -Zagross mountain. Continual geotechnical and Geophysical investigation was undertaken to recommend the type of foundations and the properties of soil layers.  

 

Lavan Oil Refinery

Client: NAMVARAN

Complete: 2007

 

Geotechnical and geological site investigation , in-situ , and laboratory testing for foundation design and sub-surface layer exploration of Lavan refinery in South of Iran. 

Azadegan Field Development

Client : INPEX

Completed: 2006

 

Mandro is conducting the preliminary geotechnical and seismic studies for one of the world’s largest oil field in South-West Iran for INPEX. The field work. The study which was done with the supervision of Foster Wheeler of U.K. was consisted of :

1- Detection of buried ordinance up to depth 30 meters.

2- Geotechnical investigation to determine the type of foundations and soil characteristics.

3- Geophysical studies to evaluate seismic properties of soil layers.

 

Dez Dam Sediments

Client : Khuzestan Water Authority

Completed: 2005

 

Geotechnical study and site investigation for Dez Dam for the study of sediments entailing drilling 100-meter boreholes in water depth of 100 meters.

Assaluyeh Offsite Facilities

Clients : N.I.P.C.

Completed 2005

Geotechnical investigation, civil works, and structural design and supervision of offsite facilities in Assaluyeh petrochemical complex, entailing 8 petrochemical plants and other services.

 

Assaluyeh Diversion Dams

Clients : N.I.P.C.

Completed:2004

Geotechnical and geological site investigation , in-situ , and laboratory testing for foundation design and sub-surface layer exploration of Lavan refinery in South of Iran. 

 

Zagross Field

Client : OEID/NIOC

Completed 2004

 

Mandro is conducting the geotechnical, environmental, hydrological and seismic studies for an oil fields in Central Iran stretching over 900 Kilometers. The field work for these investigations was completed. Final report to be issued late November.

Iran-India Gas Pipeline

Client : N.I.O.C./Gardline

Completed: 2004

 

Geotechnical\geophysical survey for Iran-India gas pipeline in Oman sea.

 

 

Iran Khazar Jack up

Client : N.I.O.C.

Completed 2004

 

Offshore geotechnical investigation and soil sampling in Caspian sea for Iran Khazar Jack up (dept of water is about 70-meter.

 

Site Engineering Services

Client:  Total South Pars

Completed: 2004

 

Site inspection engineers for quality control/quality assurance team in relation to the South Pars Development (refinery construction)

 

Providing Personnel for Training Department

Client : Total South Pars

Completed: 2003

High qualified personnel for training schedule of Total Co. in relation to South Pars Development project.