November 2011 Soroosh FSU Anchoring System
Type of Project:
Offshore Geotechnical Survey
Client:
Sadaf Company
The
field work consists of near 200m Geotechnical drilling, sampling and in-situ
testing such as SPT test. Allowable bearing capacity and settlement of different
types of pile foundations in addition with soil characteristics must be
determined for engineering purposes.
|
|
|
November 2011
THE PROVISION OF SEABED GEOTECHNICAL SURVEYS AND
ROV SERVICES FOR DRILLING OF FOUR EXPLORATORY WELLS IN PERSIAN GULF
Type of Project:
Offshore Geotechnical Survey
Client:
National Iranian Drilling Company
The field work consists of near 360m Geotechnical drilling, sampling and
in-situ testing such as SPT and CPTu tests. Also 4 1*1 km area is consider for
geophysical survey. Allowable bearing capacity and settlement of spudcans in
addition with soil characteristics must be determined for engineering purposes.
|
|
|
November
2011 Sinaye Azadi Building
Type of Project:
Onshore Geotechnical Survey
Client:
Tose Sina Company
The
field work consists of near 100m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
|
November 2011 Shahrekord Cement
Factory
Type of Project:
Onshore Geotechnical Survey
Client:
Shahrekord Cement Factory
The
field work consists of near 315m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
November 2011 Gheshm Water Refinery
Type of Project:
Onshore Geotechnical Survey
Client:
Mapna 3 Company
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
November 2011 Shahriyar Multistory Parking
Type of Project:
Onshore Geotechnical Survey
Client:
Shayegan Company
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, CPTu, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
November 2011 Shiraz Highway
Conjunctions
Type of Project:
Onshore Geotechnical Survey
Client:
Shiraz Municipality
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, CPTu, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
October
2011 Yadavaran Oil Field
Type of Project:
Onshore Geotechnical Survey
Client:
Jahanpars Company
The
field work consists of near 225m Geotechnical drilling, sampling and in-situ
testing such as SPT, CPTu, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
September
2011 Shahrekord Twin Tower
Type of Project:
Onshore Geotechnical Survey
Client:
Shiraz Municipality
The
field work consists of near 150m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
August 2011
Sirjan Electrical Modules
Type of Project:
Onshore Geotechnical Survey
Client:
Ariyahadid Company
The
field work consists of near 300m Geotechnical drilling, sampling and in-situ
testing such as SPT, electrical resistivity and downhole seismic tests.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
The dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
July 2011 Tehran
Cement Factory
Type of Project:
Onshore Geotechnical Survey
Client:
Andishehsazan Company
The
field work consists of near 250m Geotechnical drilling, sampling and in-situ
testing such as SPT, plate load, electrical resistivity and downhole seismic
tests. Allowable bearing capacity and settlement of different types of
foundation in addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers will be evaluated as
part of Geotechnical Investigation.
|
 |
|
June 2011 Multistory Parking
Type of Project:
Onshore Geotechnical Survey
Client:
Tehran Municipality
The
field work consists of near 200m Geotechnical drilling, sampling and in-situ
testing such as SPT and downhole seismic tests. Allowable bearing capacity and
settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes. The dynamic
properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
|
|
May 2011 Ahvaz
Salt Clearance Project
Type of Project:
Onshore Geotechnical Survey
Client:
Petrotaksan Company
The
field work consists of near 100m Geotechnical drilling, sampling and in-situ
testing such as SPT and plate load tests. Allowable bearing capacity and
settlement of different types of foundation in addition with soil
characteristics must be determined for engineering
|
 |
|
April
2011 Latman Kan Residential Building
Type of Project: Onshore
Geotechnical Survey
Client:
Mellat Bank Construction Company
The
field work consists of near 1000m Geotechnical drilling, sampling and in-situ
testing such as SPT tests. Allowable bearing capacity and settlement of
different types of foundation in addition with soil characteristics must be
determined for engineering purposes.
|
|
|
March
2011 Noboniyad Residential Building
Type of Project:
Onshore Geotechnical Survey
Client:
Ebtekar Sazeh Company
The
field work consists of near 150m Geotechnical drilling, sampling and various
in-situ testing such as SPT and downhole seismic tests. Allowable bearing
capacity and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes. The dynamic
properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
February
2011 Darous Building
Type of Project:
Onshore Geotechnical Survey
Client:
Atava Construction Company
The
field work consists of near 100m Geotechnical drilling, sampling and various
in-situ testing such as SPT, downhole and piezometer tests. Allowable bearing
capacity and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes. The dynamic
properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
January
2011 Samen Chadormaloo Steel Factory
Type of Project:
Onshore Geotechnical Survey
Client:
Arkan Tadbir Sazeh Company
The
field work consists of near 200m Geotechnical drilling, sampling and various
In-situ testing such as SPT and permeability tests. Allowable bearing capacity
and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes.
|
|
|
January
2011 Farashband Gas Refinery Extention
Type of Project:
Onshore Geotechnical Investigation
Client:
Chegalesh Consulting Engineers
The
field work consists of near 300m Geotechnical drilling, sampling and various
In-situ testing such as down hole, SPT, pieozometer, Electrical Resistivity, and
Vane shear tests. Allowable bearing capacity and settlement of different types
of foundation in addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers will be evaluated as
part of Geotechnical Investigation.
|
|
|
October
2010 South of Tehran Subway (Parand)
Type of Project:
Onshore Geotechnical Investigation
Client:
Rahsaz Tarh Company
The
field work consists of near 1900m Geotechnical drilling, sampling and various
In-situ testing such as SPT, down hole, pieozometer tests. Allowable bearing
capacity and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes. The dynamic
properties of soil layers will be evaluated in a separate seismic report.
|
 |
|
October
2010 Mahboub Liyan Shipyard
Type of Project:
Onshore & Nearshore Geotechnical Survey
Client:
Mahboub Liyan Shipyard Company
The
field work consists of near 300m Geotechnical drilling, sampling and various
In-situ testing such as SPT and piezometer tests. Allowable bearing capacity and
settlement of different types of shallow and deep foundation in addition with
soil characteristics must be determined for engineering purposes.
|
 |
|
September
2010 Waste water Transmission from Tehran to Qom
Type of Project:
Onshore Geotechnical Survey
Client:
Qom
Regional Water Company
The
field work consists of near 200m Geotechnical drilling, sampling and various
In-situ testing such as SPT and permeability tests. Allowable bearing capacity
and settlement of different types of foundation in addition with soil
characteristics must be determined for engineering purposes.
|
 |
|
September
2010 Mashhad Subway
Type of Project:
Onshore Geotechnical Survey
Client:
Mashhad Urban & Suburban Railway Operation Company
The
field work consists of near 600m Geotechnical drilling, sampling and various
In-situ testing such as plate load, down hole seismic test, pressure meter and
electrical resistivity tests. Allowable bearing capacity and settlement of
different types of foundation in addition with soil characteristics must be
determined for engineering purposes. The dynamic properties of soil layers will
be evaluated as part of Geotechnical Investigation.
|
 |
|
August
2010 Imam Khomeyni International Airport Hotel
Type of Project:
Onshore Geotechnical Survey
Client:
Tarh va Afarinesh Company
The
field work consists of near 80m onshore Geotechnical drilling, sampling, in-situ
testing such as SPT test. The test performed by drilling machines and adequate
instruments. Allowable static and dynamic bearing capacity and settlement of
pile foundation in addition of soil characteristics must be determined for
engineering purposes.
|
 |
|
August
2010 Jofreh
Port
Type of Project:
Offshore Geotechnical Survey
Client:
Iran Fishers Organization
The
field work consists of near 170m offshore Geotechnical drilling, sampling,
in-situ testing such as SPT test. The test performed by drilling machines and
adequate instruments. Allowable static and dynamic bearing capacity and
settlement of pile foundation in addition of soil characteristics must be
determined for engineering purposes.
|
 |
|
July
2010 Mellat Auto Bank :
Type of Project:
Onshore Geotechnical Survey
Client:
Mellat Bank
The
field work consists of 250m onshore Geotechnical drilling, sampling, in-situ
testing such as SPT and Downhole Seismic tests. The tests will be performed by
drilling machines and adequate instruments. Allowable static and dynamic bearing
capacity and settlement of different types of shallow foundation in addition of
soil characteristics and bearing capacity of rock layers must be determined for
engineering purposes.
|
 |
|
May
2010 Qom General Water Refinery (Second Module):
Type of Project:
Onshore Geotechnical Survey
Client:
Qom Water and Wastewater Company
The field work consists of 366m onshore
Geotechnical drilling, sampling, in-situ testing such as SPT, PMT, Plate Load
and Downhole tests. The tests will be performed by drilling machines and
adequate instruments. Allowable static and dynamic bearing capacity and
settlement of different types of shallow foundation in addition to soil
characteristics and bearing capacity of rock layers must be determined for
engineering purposes.
|
 |
|
April 2010 Vanak Commercial Complex:
Type of Project:
Onshore Geotechnical Survey
Client:
Royal Renaissance Company
The
commercial complex consists of a 28 stories building with 8 stories located
underground. The field work consists of one 60m Geotechnical borehole drilled
under the high rise part. Allowable static bearing capacity and settlement of
different types of shallow and deep foundation in addition to exploration
program prepared by Mandro (2004) for engineering purposes. In order to check
the bearing capacity of foundation for lowerrity underground water and
stabilizing the walls of excavation, further investigation will be prepared.
|
|
|
March 2010 Jask Oil Terminal:
Type of Project:
Offshore & Onshore Geotechnical Survey
Client:
Iranian Oil Terminals Company (IOTC)
The
field work consists of 630m offshore and 1210m onshore Geotechnical drilling,
sampling, in-situ testing such as SPT, PMT, Electrical Resistivity, Plate Load,
CBR and Downhole tests, Geological, Hydrological, Hydroclimatological and
Seismic Hazard risk will also be studied. Offshore survey will be perform from
ARTEMIS and ARAS drilling vessel and Onshore survey will be performed by 4
mobile and skid base drilling machines. Allowable static and dynamic bearing
capacity and settlement of different types of shallow and deep foundation in
addition to soil characteristics and liquefaction must be determined for
engineering purposes.
|
 |
|
February 2010,Qeshm Bunkering Berth:
Type of Project:
Offshore Geotechnical Survey
Client:
Qeshm Star Bunkering and
Shipping Services
The
field work consists of 160m offshore Geotechnical drilling, sampling and in-situ
testing such as SPT tests. The tests carried out from ARTEMIS drilling vessel.
Allowable bearing capacity and settlement of different types of foundation in
addition with soil characteristics must be determined for engineering purposes.
|
 |
|
February 2010 Yadavaran Oil Field:
Type of Project:
Onshore Geotechnical Investigation
Client:
Sinopec (China)
Mandro
is performing Geotechnical and seismic studies for Yadavaran Oil Field which is
one of the world's largest oil field located South-West Iran. The field work
which was started recently is consisted of 1800m Geotechnical drilling, sampling
and various in-situ testing such as plate load, down hole, pressure meter, CPTu
and electrical resistivity tests. Allowable bearing capacity and settlement of
different types of foundation in addition with soil characteristics must be
determined for engineering purposes. The dynamic properties of soil layers will
be evaluated as part of Geotechnical Investigation.
|
 |
|
February 2010 Karaj Subway Route 4th Line:
Type of Project:
Onshore Geotechnical Investigation
Client:
MOSHANIR Company
The
field work consists of near 3000m Geotechnical drilling, sampling and various
In-situ testing such as plate load, down hole, pressure meter and electrical
resistivity tests. Allowable bearing capacity and settlement of different types
of foundation in addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers will be evaluated as
part of Geotechnical Investigation.
|
 |
|
February 2010
Phase 12 South Pars Refinery Fire Tanks:
Type of Project:
Onshore Geotechnical Investigation
Client:
NASR Consortium
The
field work consists of near 80m Geotechnical drilling, sampling and various
In-situ testing such as down hole, pressure meter and SPT tests. Allowable
bearing capacity and settlement of different types of foundation in addition
with soil characteristics must be determined for engineering purposes. The
dynamic properties of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
February 2010
IRANSHAHR Combined Cycle Power Plant:
Type of Project:
Onshore Geotechnical Survey
Client:
MAPNA Power Plant Construction & Development Company
The
field work consists of near 460m Geotechnical drilling, sampling and various
in-situ testing such as plate load, down hole, pressure meter and electrical
resistivity tests. Allowable bearing capacity and settlement of different types
of foundation in addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers will be evaluated as
part of Geotechnical Investigation.
|
 |
|
January 2009 , Hormozgan II (Gueno) Combined Cycle Power
Plant:
Site:
Hormozgan Province-Gueno
Type of Project:
Onshore Geotechnical Survey
Client:
MAPNA Power Plant Construction & Development Company
The field work consists of near 620m Geotechnical drilling,
sampling and various in-situ testing such as plate load and
electrical resistivity tests and laboratory testing.
Allowable bearing capacity and settlement of different types
of foundation in addition with soil characteristics must be
determined for engineering purposes. The dynamic properties
of soil layers will be evaluated as part of Geotechnical
Investigation.
|
 |
|
January 2009
, Kourosh Cultural and Commercial Complex:
Site:
Tehran
Type of Project:
Retaining Structure Designation (Nailing)
Client:
Golrang Sazeh Company
The field work consisted of Geotechnical drilling, sampling,
in-situ testing such as pressure meter and direct shear test
is completed. Nailing wall for 36 m height is designed.
Verification and proof tests and also quality control of
construction is under
progress and 80% of the work is completed.
|
 |
|
January
2009
,
Imam Khomeyni Airport – Runway (2nd phase) &
Jahrom Combined Cycle Power:
Site: Tehran
Type
of Project:
Material Quality Control
Client:
Meli Sakhteman Company& MAPNA Power Plant Construction
The field work consists of materials (soil, concrete,
asphalt) quality control which is two site laboratories for
quality control of soil, and asphalt and concrete material
were established at Imam Khomeini Airport on the city of
Tehran and Yadavaran city of Fars receptivity.
|
 |
|
December
2009 , Ardebil Extension Gas Turbine Power Plant:
Site:
Ardebil
Type of Project:
Onshore Geotechnical Survey
Client :
MAPNA Power Plant Construction & Development Company
The
field work consisted of Geotechnical drilling Sampling and
various In-situ testing such as
pressuremeter,
plate load and electrical resistively test. Allowable
bearing capacity and settlement of different types of
foundation in addition with soil characteristics have been
determined for engineering purposes. The dynamic properties
of soil layers have been also evaluated with down hole test
as a part of Geotechnical Investigation.
|
 |
|
December 2009 , Petronas
Turkmenistan ( in KIYANLI) Gas Separation Plant Project:
Site:
( KIYANLI) Turkmenistan
Type of Project:
Onshore Soil Investigation and Topography
Survey
Client:
Petronas Company
The field work consists of near 90m Geotechnical drilling,
Sampling and various in-situ testing such as down hole,
Electrical resistivity, Mackintosh tests and buried
structure detection. Topography and benchmark survey in
addition with soil characteristics must be determined for
engineering purposes. The dynamic properties of soil layers
will be evaluated as part of Geotechnical Investigation.
|
 |
|
|
|
|
|
|
| |
|